Board Meeting Minutes: September 26, 2007

Attending: Steve Bruner, Steve Dembitzer, Michael Hansen, Peter Levy, Katharine Mukherji, Matthew Pilkington, Cynthia Steele, Peter Burgess, and Jose Perez (for the discussion of maintenance issues)I. Maintenance Report (with Jose)

The Dembitzer (1Q) floor is not finished from last sewage back up.

Mario has replaced the large common deck. The roof is still being repaired. He picked up part of deck where pitch pocket needed attending to and

replaced it without any damage to the deck.

Mario has repainted flashing on 122 Bergen.

The old back-up boiler has not been repaired. Two boiler companies we consulted re the repair said it wasn’t worth it. Instead of attempting to repair it or even throw it away (which would require dismantling it and a very costly and complex disposal process), we intend to manage with one boiler, which most buildings do, but to make sure that the service contract is up-to-date and that the company is quick to respond to all problems. We agreed to buy $1700 maintenance contract with Abilene for the upcoming heating season.

Carpet cleaning for 134 Boerum Place has been ordered, needed due to soiling from contractors’ repairs in the building and on the roof.

The board discussed asking for deposits/fines from owners doing work, so that if any damage is done to common areas, it will be deducted from this amount. The by-laws state that the condo board can levy fines against anybody that has caused damage to the common areas. In addition, Jose has also been stern with Skytrack contractors about its workmen not leaving messes when working. In the future, deductions may be taken from payments in such cases.

II. Finances/Outcome of 3C suit

As you know from reports at previous annual meetings and some Board meeting minutes, the Condominium was appealing the decision[1] the Court made to award $35,000 to the Victoria Whitmore, the owner of 3C.

We recently learned that we lost that appeal. Michael Marino, our attorney, joined us to discuss that decision and possible remedies. He advised us that it would be a costly gamble to continue to try to appeal this decision, as unfair as we feel it to be.

We had put into escrow $41,000 as collateral. The judgment has been paid from this, and the $6,000 remaining is working its way through the legal system; it will be put back into our operating account. We have initiated a new lawsuit, piggybacking onto one started by the bank holding her mortgage, to recuperate the common charges owed since the 2005 ruling where the judge mandated that she pay. In addition, Skytrack put a lien against her property, so that, in the event it should be sold or foreclosed, we would receive back charges owed before the proceeds are distributed.

This is a very frustrating outcome and experience for all of us. We are all part of a community; it is unfair that when one person does not pay their share of the common elements we all use-such as heat, water, maintenance, the super’s salary, trash removal, insurance–it falls to the other members of the condominium to make up the shortfall. You can be confidant that the Board of Directors will vigorously pursue any owners who default on their obligations.

Other financial matters: The management company locked in a very good price for heating oil through January. Several insurance claims related to the recent floods have been submitted and are pending.

III. New Business

Steve Bruner has been elected treasurer-elect, as Mike Hansen will be leaving the Board soon.

The Board is looking into carpet and paint selections for the 2nd and 3rd floor of 120, as well as surfaces for the back stairs and garbage floor of 120. We hope to make decisions and start implementation of these upgrades in the next month or two. In addition, redecoration updates for 15 Bergen are being considered.

The meeting was adjourned at 9:30. The next Board meeting is October 24.
[1] The ruling favored her claim that she was denied constructive use of part of her condominium due to noise from a fan on the roof, which she claimed had been raised with the management company and the board (but for which there is no evidence nor recollection). However, since Ms. Whitmore had not paid her management fees during this period, she was instructed by the Court to resume payment of management fees, upon resolution of the issue. The Condominium installed a baffle on the roof to muffle the sound of the fans within a month of the decision but Ms. Whitmore has continued to not pay any monthly management fees.

Board Meeting Minutes: June 13, 2007

Attending:  Steve Bruner, Steve Dembitzer, Michael Hansen, Peter Levy, Katharine Mukherji, Cynthia Steele, and Jose Perez (for the discussion of maintenance issues)Maintenance

Jose gave an update on maintenance issues:

  • The roof has been repaired at 134 and roof pitch-pockets at 120 were filled.   The roof over the garage was replaced and the flashing fixed.  The garage façade was repainted.
  • Several common element leaks were fixed (e.g. around the skylight affecting 3D) or addressed (concern of leak for 1H) and others will be looked into (possible leaks under decks for 3D and 3M).
  • The gardening consultant was hired, who will treat the yews and soil at the beginning and end of the garden season (early summer and fall).  Drip irrigation was installed by Matthew Pilkinton (thank you).

The following decisions were made regarding maintenance.

  • We are getting estimates to replace the canopies.
  • Repairs on the roof deck are to be expedited.
  • We will have the sidewalk in front of 15 Bergen repaired, when the project next door does its section of sidewalk.
  • We are getting estimates and samples regarding painting and carpet replacement for the 2nd and 3rd floors of 120, and based on costs and our finances, will decide when this can be undertaken.  A small committee will be formed to arrive at consensus on color choices (if you are interested in having a voice, please contact Matthew Pilkington or Katharine Mukherji).

Note:  The exterminator comes the 2nd Wednesday of every month to exterminate in common areas where rodents and bugs are likely to be found.  If you want to have your unit exterminated, please coordinate with Jose so that they can do it in conjunction with their regular visit.

Finances

We reviewed the financial reports; we are in good standing.   There are several anomalies regarding the arrears report which will be reviewed with the Management Company (Peter Burgess was unable to attend this meeting).

The City made an assessment value offer, which we refused according to advice from our Attorney.  Our accountant will complete and submit a financial audit form to arrive at a more realistic value.

There being no further business the meeting was adjourned at 9:30 p.m.  The next regular board meeting is scheduled for September 26th, 2007, unless a special meeting is required in the summer.

Annual Board Meeting Minutes: May 9, 2007

A quorum was achieved (63% in person & by proxy) and the meeting began at 8:00 pm.The board introduced themselves and the group voted to waive the reading of last year’s minutes.

Mark Levitch, the condominium’s accountant, reviewed the financial records from 2006 and budgeted amounts.   With the increase in assessment, we expect the 2007 budget to be in line with projected expenses which have risen in recent years with the increase in fuel and other expenses.  An update was provided on the pending appeal regarding unit 3C and back charges owed.  We hope to have a decision by the Court within the coming months.

Peter Burgess reviewed renovations over the last year such as addressing the flooding experienced by 7 apartments and replacing/snaking central plumbing pipes in 134.  Future repairs include pointing, repairing several roofs, including replacing the garage roof; replacing awnings on all Dean Street and Bergen Street, and replacing rotting boards on common decks.  The board reiterated its priority to fund renovations addressing safety concerns first.  We do hope to be able to paint and re-carpet the 2nd and 3rd floor hallways in 120 this year and will ask volunteers from those halls to come to consensus about color choices.

We discussed the balance the Board strives to meet between keeping owners’ costs down (i.e. by minimizing increases in common charges or eschewing assessments) and funding aesthetic upgrades in the buildings.  We realize that there is a spectrum of views in this regard among owners, with some keen to invest in physical improvements and others whose priority is to keep costs down.   Members were asked for a show of hands to give the Board a sense of their relative preferences regarding these two alternatives, but it was inconclusive.

Two board member terms were expiring; Steve Bruner and Katharine Mukherji.  No one expressed interest to run for their positions so the two members were reelected by the owners present.  The board accepted Jan Glinski’s resignation due to his extensive travels, and thanked him for his service.   As both Jan and Juan Paez stepped down from the Board, and no other owners were interested in joining the Board, the owners voted to change the number of Board members from 9 to 7, at least for this year.

New Business

Con Ed Solutions was mentioned as a green alternative to Con Edison.  Also to be ‘greener’, a recommendation was made to consider motion detectors to turn on the lights in the garage, rather than having them permanently on.

There being no further business the meeting was adjourned at 9 pm.

Board Meeting Minutes: April 25, 2007

In attendance: Peter Levy (President), Katharine Flanders Mukherji (Vice-President), Michael Hansen (Treasurer), Steven Dembitzer, Steven Bruner, Peter Burgess (Managing Agent) Maintenance

After an early April kitchen sink back-up, new drain pipes were installed to replace unsnakeably clogged pipes in 134 Boerum Place.  Other drain pipes in that building were snaked as well.  Leaks also occurred after the Nor’easter in April. The garage roof leaks were due to many tears in the roof membrane, which will be replaced completely, and the parapet flashing will be repaired.  Additional leaks in 134 Boerum during the storm demonstrated a need for pointing of that building’s Boerum Place brick parapet, which will be undertaken.  There were roof leaks into 3D, 3K, 3L, and 3M.  The roof there will be examined to see if it can be patched at the sites from which water entered.  The leaks into 122 Boerum were due to clogged roof drains and the resulting pooling which had to be pumped out.  There had been new decks installed by previous owners who neglected to install access panels to the roof drains.  One such hatch has been installed and other drains will be searched for, and hatches installed, when they are found.  Owners are responsible for seeing that these drains are kept clear, since the only access is from their apartments. We are happy to report that there were no basement back-ups!

Some more roof fans were repaired or replaced. We will look into painting the exposed girders in the courtyard of 120. Bids are being taken for gardening since Matthew Pilkington, who has been volunteering in this effort can no longer spend the time.

Finances

Almost all arrears have been paid up except for those of 3C.  The appeal of the court case regarding the massive arrears owed by the owner of 3C is still pending.  Despite the judge’s order at the original trial, owner of 3C has still not paid any common charges.

New Business

The annual meeting date is scheduled for May 9th at at the Montessori school on Bergen Street.  If you cannot attend, please give a proxy to a neighbor or member of the board, since a quorum is required to conduct business.  Three positions on the Board are open for (re)election.  If there is anything new to report, the lawyer will make a presentation about the status of our case against owner of 3C for non-payment of common charges.  Accountant’s report will be presented.  Managing agent, Peter Burgess, will present a list of work that was done recently.  Budget for next year will be discussed.

The next Board meeting is scheduled for June 13th.

The meeting was adjourned at 9:00 p.m..

Board Meeting Minutes: March 28, 2007

Attending:  Steve Bruner, Steve Dembitzer, Michael Hansen, Peter Levy, Katharine Mukherji, Cynthia Steele, Peter Burgess, and Jose Perez (for the discussion of maintenance issues)Maintenance

Jose gave an update on maintenance issues:

In general, Jose said “March was a good, quiet month.” A concern about hot water with the boiler was resolved quickly. Jose made minor adjustments in some roof fans, to improve functionality of ventilation.

 
Keyspan and the Fire Department came and checked out a reported concern about the smell of gas in Apartment 3 and found that there was no gas leak.

Next month, the garbage bin unit for 134 Boerum Place will be built and placed next to the other wooden storage unit adjacent to the garage.  This will replace the current bins in the basement where the descent by steep stairs was deemed a potential safety hazard by the Board.  The unit will be as discreet as possible, while still functional, and built with a sloped lid so that it cannot be used as seating.

FinancesWe reviewed the financial reports; we are in good standing.  We made a decision to pay the full water bill of $11,000, which is much larger than usual since the City did not bill us for a long time.

The line of credit for $250,000 is in place at North Shore Bank.

New Business

1)  We discussed the issue of noise.  Some conclusions were:

  • We are pursuing discussions with NYSC about its delivery trucks that park outside 120 and leave the motors idling (and sometimes play music).  We will also talk with the two schools on Bergen about having the bus drivers turn off their motors if they will be standing for some time.
  • The condominium’s rules about noise include covering the majority of floor space with carpeting, not having (loud) work done in units before 9 am or after 5 pm or at any time on Sundays, and refraining from playing loud music or television after 11 pm.
  • Because the hallways and doorways transmit noise, residents are requested to close doors quietly, not shout, and to avoid talking on their cell phones in common areas (such as the 120 lobby).
  • As a general guideline, we discussed the importance of residents being respectful and considerate to avoid excessive noise especially ‘after hours’, to give neighbors a ‘heads up’ if a party or other unusually loud event is going to happen, as well as of being tolerant, since the walls and floors are not soundproof and neighbors will make some noise in their day-to-day activities.

2)  Repairs

We are getting a bid on covering the Dean Street stairs and fixing the 120 upstairs roof deck.  The latter is a safety issue and will take precedence over other work.  Once we see what we can afford, at the next meeting, we will order the priorities of painting and carpeting the second and third floors of 120, covering the back stairs and anything else that has arisen in the meantime.

3)  Gardening

We are looking into commercial services to water and tend the plants, and plan to make a decision before the spring season.  Matthew Pilkington, who has taken a lead role on plant maintenance in past years, will assess their services and costs with two other board members.

The next annual meeting is Wednesday, May 9 at the Montessori School.

There being no further business the meeting was adjourned at 9:30 p.m.  The next board meeting is scheduled for April 25th, 2007.

Board Meeting Minutes: January 23, 2007

Present: Peter Levy, Matthew Pilkington, Mike Hansen, Steve Dembitzer, Steve Bruner and Peter Burgess

Maintenance Items

Jose Perez was invited by the Board to give a run down of maintenance issues. The boiler had various mishaps starting December 24th 2006. Old heating tubes are normally plugged once they have corroded to the extent that they cannot be used any more. This is cheaper than replacing the entire tube. But the plugs blew off due to corrosion at the ends of the old tubes and needed to be replaced completely.

The expansion tank, which is part of the heating system and is at the top of the eastern staircase of 120 Boerum Place, sprang a leak and had to be replaced. The new tank is now in the boiler room and not at the top of the stairs. The old expansion tank was repaired, taken off line, but kept in case of the new tank malfunctioning.

On Jan 21st the flame scanner broke. The scanner monitors the burning of the gas or oil in the furnace. The flow of fuel to the furnace shuts off when the scanner is broken or there is no flame in the furnace. This is a safety feature. The repair company fortunately had a spare, but 2nd hand, scanner and replaced the part late Sunday night. The Board discussed buying a spare scanner in case of emergency.

Jose tested all the emergency lights in the hallways and will be replacing the batteries in some of them that have reached the end of their electrical life.

The basement corridor in 120 Boerum Place is full of debris from the installation of the one-way valves. Jose will ask the contractor to remove it when he returns to complete the job.

Arrears

With exception of 3C, the condo. has less than $1500 in arrears.

Accountant

The accounting firm of Levitch & Kriegsman raised their fees by $300 to $5700. This increase was approved by the Board with a request to keep the amount stable for the next two years.

Exterminator

The current exterminator has had his contract terminated and Peter Burgess is contracting with a new company. Under New York City building code, the condo. has to have a contract with a licensed exterminator.

Budget

The Board examined the budget and the overruns that have occurred this year. Electricity costs were up over $10,000. Con Ed has been charging fuel surcharges year round and prices have nearly doubled over the last few years. Energy costs and other inflationary pressures have caused the building to be in danger of constant arrears without recent assessments. Therefore the Board voted unanimously to increase the Common Charges by 10% this year starting March 1st. The board believes an increase of another 10% is inevitable next year, but the board will re-evaluate the financial condition at that time. In addition, the Board approved subsequent annual increases of at least 3% to keep up with inflation. The budget has to keep up with rising costs and with the continuing maintenance capital expenditure.

The Board approved a $250,000 line of credit to be used for emergencies. The condo. has funds in case of an emergency but not enough to cover extraordinary items such as replacing a boiler. This would give the condo. a cushion in which to raise funds from the owners for a period of time via an assessment without causing a major price spike in condo. fees. The line of credit will last 10 years.

Some condo. owners suggested an interim meeting for the condo. The Board suggested bringing the AGM forward to early May from June instead of an extra general meeting.

Notes to the Owners

Owners do not have the right to give contractors permission to start work on projects that they expect the condo. to pay for without the express approval by Peter Burgess Management. Bills submitted for payment without prior consent will not be reimbursed.

Please do not leave umbrellas, boots, shoes, strollers or any other belongings in the communal hallways. Please bring them inside your apartments.

The next board meeting will be on February 28th.

With no other business to be discussed, the meeting was adjourned.

Property belonging to a residential unit

Your responsibility; not the superintendent’s or condominium’s

  • Area enclosed by the perimeter walls, floors, and ceilings of the unit.
  • Flooring material (but not the sub-floor).
  • Exposed layer of plasterboard of the perimeter walls.
  • Exposed layer of perimeter ceiling material (plasterboard or cement).
  • Interior doors and walls (but not common elements* inside those Walls).
  • Entire “loft” structure (but not common elements* within the walls and floors of the structure).
  • All appliances, plumbing fixtures, kitchen and bathroom cabinets and surfaces.
  • All interior plumbing serving the unit (but not the common* stacks).
  • Electric circuit-breaker panel and all wiring and wiring devices emanating from it (but not the wiring that delivers power to the panel).
  • Intercom unit (but not the wiring connected to it).
  • All staircases and floor structures within duplex and triplex units.
  • All windows, sliding doors, hinged doors, screen doors and skylights (but not the exterior walls in which they are mounted). The condominium has the responsibility for painting the exterior surface of these doors and windows.
  • Hot water heating pipes that serve the unit, valves, thermostats, and Baseboard heating element concealing structure.
  • Sprinkler heads and pipes that serve the unit (but not the common* feeder pipes and valves).

*common elements are those that are utilized for, or serve more than one unit.
You can download the document Alterations of Common Elements here