Meeting conducted via videoconference
Board Members Present: Peter Levy, President; Katharine Flanders Mukherji, V.P.; Andrew Kurland, Sec.; Matthew Pilkington, Treas.; Michael Tedesco; Cameron Martin; Hannah Berkin-Harper; Malik Ashiru
Also in Attendance: Valdet Boleviq, Superintendent; Kathleen Malara, EM Holding Corp.
Superintendent’s Report:
- Roofs over 1O and 1P have been replaced to address leaks.
- New outlet covers were installed in 2nd floor hallway at 120 Boerum.
- Super worked with Management to address issues identified by insurance co., including clearing items from basements and ensuring mandatory signage is present.
- Exterior door locks have been replaced at all buildings; roof door locks will be replaced in the coming days.
- A faulty water pipe was identified in a Unit at 120 Boerum and was repaired. Damage to the “E line” will be assessed.
- A failed ventilation fan on the “A line” at 120 Boerum was replaced.
Financials:
- The Condo’s finances were reviewed, and everything is in good order.
- We are still waiting to receive the breakdown of property tax refunds from our attorneys. As soon as we have that information, we will issue checks to Units who are entitled to refunds.
New Business:
- Water damage from leak at 120 Boerum has been assessed by insurance company, and contractor expects to begin repairs to affected common areas on Monday, Nov. 2.
- Next phase of roof replacement will begin at Units 3E and 3F soon.
- The Board discussed preliminary “wish lists” for renovations to common areas at 15 Bergen, 134 Boerum, and 122 Boerum, and is considering architects to assist with generating plans.
Other Important Reminders and Updates:
- Our building insurance company notified us that window air conditioners must be properly installed, with angle brackets securing them to the building. The Board reserves the right to fine owners who do not comply with this requirement.
- The Super is ensuring that the Condo has working keys to all Units for use in event of an emergency, and may request new keys from particular Units. Compliance is mandatory.
- Remember that masks are required in hallways at all times due to the COVID pandemic.
- Election Day is November 3. Make sure to VOTE if you haven’t already!!