Due to a leak in Unit 3L, the building water had to be shut off for a short period of time this morning (Friday, October 19). The leak has been isolated and is being repaired, and the water has been turned back on.
Emergency Water Shut Off (updated – water back on)
Due to a leak on the 3rd floor the building water has been shut off. The issue is currently being investigated and we will provide an update as soon as possible.
Updated Website Activated
We have updated the Condo’s website. Improvements include some new content (such as an “FAQ” page) and clearer layout. It should also now be easier to access the site from different types of devices, including smartphones and tablets. Please reach out if you notice any issues or have any concerns or feedback. Thank you.
Heating System to be Turned On
Please note that as fall is upon us, the heating system will be turned on today (Sunday 10/14). You may hear your radiators making some noise. Thank you.
Limited Hot Water tomorrow
Apologies for the late notice, but we have just learned there may be a reduced amount of hot water tomorrow (9/26) from approximately 9 am through 12 pm, so that necessary maintenance can occur. Thank you for your understanding.
No Hot Water Tomorrow 10 am – 4 pm
In connection with necessary inspection, maintenance, and repairs to the heating and hot water systems, please note that there will be no hot water from 10 AM to 4 PM tomorrow, Thursday, September 20th. Thank you for your understanding.
Expect No Hot Water Thursday Sept 20th
In connection with necessary inspection, maintenance, and repairs to the heating and hot water systems, please note that we expect there to be no hot water during the day on Thursday, September 20th. We will provide more specifics as to timing here and on posted signs as soon as we have additional details. Thank you for your understanding.
Heating System Will Be Refilled Soon
Please be advised that the heating system needs to be refilled to prepare for the heating season, and once it is, it will no longer be possible to perform any modifications to radiators/heating pipes within your Units. Any remaining Owners who desire to complete such work in their Units must do so this week. Thank you for your understanding and cooperation.
120 Boerum Pl., only New Mailboxes are now being used By USPS
The old ones will be removed.
120 Boerum Lobby and Stairs Open
We are pleased to announce that the main entrance, lobby, and stairs at 120 Boerum Pl. have reopened. USPS continues to deliver mail to the temporary location at Dean Street but we are urging them to switch to the new mailboxes in the main lobby as soon as possible.