Reminder – Heating System is Drained Temporarily

This is a reminder that the heating system has been drained for the past 3 weeks to allow all owners to have necessary repairs/modifications performed on the components of the heating system in their units.  A date for re-filling of the system has not yet been set, but will need to be scheduled soon.  Accordingly, if you would like to have any work performed, please schedule this with the Super/Management as soon as possible.  You must coordinate all such work with the Super/Management, as there will still be some water in the system in various locations, and precautions must be taken to ensure there are no leaks.

Once the heating system is re-filled, it will not be drained again (as doing so is both costly and wasteful).  Thank you for your understanding.