Author: Skytrack
Water Shut-Off, Mon. 6/19/17
On Monday, June 19, the Condo’s water will be shut off from 10 AM to 1 PM, to facilitate renovations in Unit 3E.
Skytrack Smoke-Free Housing Survey
Please fill out the short survey at:
Board of Managers Meeting Minutes: January 24, 2017
Board Members Present: Peter Levy, Pres.; Katharine Flanders Mukherji, Vice Pres.; Matthew Pilkington, Treas.; Andrew Kurland, Sec.; Terra Chalberg; Michael Tedesco; Hannah Berkin-Harper; Levi McConnell; Cameron Martin. Also in Attendance: Elia Malaria, Managing Agent; José Perez, Superintendent.
Superintendent’s Report:
- The buildings are in good repair in general.
- Leak to boiler was identified and repairs were completed.
- Broken electrical outlet in 1st floor hallway of 120 Boerum was replaced.
- Arborist will trim mulberry tree overhanging roof track Mon. 1/30, and roof work was completed by 3I and 1Q to address minor leaks.
Financials:
- Everything is in good order, and Skytrack is in a strong position going into 2017. Thankfully, no major expenditures were required in 2016, and we now are better able to accomplish necessary maintenance and upkeep throughout the buildings.
- Late fees have been collected from units who paid Common Charges late. Reminder to pay on time to avoid fees, and that as of January 1 late fees have increased to $50.
New Business:
- Light on exterior of garage is not functioning properly; will investigate replacement/repair.
- Estimates for refurbishment of Dean Street entryway and stairwell were presented, and the Board selected a contractor to complete the work.
- Discussions concerning repair of 15 Bergen roof decking and repainting of railings and beams in courtyards took place.
- The Design Committee will meet to discuss proposals for the Lobby renovation that will be presented to the Board, and then to all owners, as approval of such work will require a vote.
- The worn-out door to the roof of 134 Boerum Pl. will be replaced.
- Cable Co. will be contacted to repair cosmetic issues with cable raceways in hallway ceilings.
Important Reminders and Updates:
- Some personal belongings remain in Common Areas of buildings; those responsible will face repercussions including fines and the removal/disposal of these items.
- Reminder that owners are responsible for any damage their contractors cause.
- José will be on vacation until February 13. Patrick will be filling in in his absence.
- Refurbishment of Dean Street entryway and stairwell is anticipated to commence Thursday, Feb. 2, and is scheduled to last approximately 3 weeks. The stairwell and entryway will be unavailable each day when the work is occurring.
EMERGENCY CONTACTS:
Elia Malara (718) 625-4671 / José Perez (646) 239-8762 / Patrick Knights: (347) 339-4478
Water Shut-Off, Thurs. 10 -1
The water will be shut off on Thursday, Jan. 19 from 10 AM until 1 PM, to allow repairs in unit 1M.
Sorry for the inconvenience.
Board of Managers Meeting Minutes: December 6, 2016
Board Members Present: Peter Levy, Pres.; Katharine Flanders Mukherji, Vice Pres.; Matthew Pilkington, Treas.; Andrew Kurland, Sec.; Terra Chalberg; Michael Tedesco; Levi McConnell; Cameron Marin. Also in Attendance: Elia Malaria, Managing Agent; José Perez, Superintendent.
Superintendent’s Report:
- The buildings are in good repair in general.
- Boiler has been serviced for the heating season.
- Repairs have been completed to the façade of 122 Boerum Pl; wood has been replaced with aluminum for future durability.
- Accumulated junk has been removed from basement and properly disposed of.
- Two new vacuum cleaners purchased to replace broken ones in 120 and 134 Boerum.
- Leaves will be swept from roofs, and arborist will come to trim back overgrown tree.
Financials:
- Everything is in good order.
- Late fees have been collected from units who paid Common Charges late. Reminder to pay on time to avoid fees. Late fees will rise from $25 to $50 as of January 1, 2017.
New Business:
- A persistent objectionable order in hallway of second floor of 120 Boerum is being investigated, and carpets will be shampooed in attempt to alleviate.
- 134 Boerum Pl. Common Area carpeting will be shampooed.
- Repairs to fix issues with roofs above 1Q and 3I have been approved and will take place.
- Broken timer on entranceway light to 134 Boerum place will be replaced with automatic light sensor.
- Discussions regarding use of “hot tub room” continue; Board is obtaining estimates for renovations to this room.
Important Reminders:
- The Board would like to wish you happy and healthy holidays. Please remember that this is the time of year to reward José and Patrick for their hard work.
- In bringing holiday trees in and out, cleaning up any needles dropped in the hallway and lobby is your responsibility and should not be left to the employees. Coordinate with José, who will have oversize plastic bags available, for proper disposal of trees to avoid fines.
- Please be careful if using open flames/candles. Let’s keep Skytrack safe.
- A coat drive is in progress this month for New York Cares. Coat collection box is located inside the Dean Street entrance to 120 Boerum Pl.
EMERGENCY CONTACTS: Elia Malara (718) 625-4671 / José Perez (646) 239-8762
Coat Drive
Attention residents:
This year we are one of the Condos partnering with New York Cares/Halstead Property for their annual coat drive for the needy. A collection box will be placed in the Dean Street entry way of 120 Boerum Pl., and will remain for the next few weeks. Please place your unwanted outerwear there. Thank you, and happy holidays.
Owner Survey
Survey
Dear Skytrack owners,
As you may have heard several owners and the board have started the planning process for redesigning the 120 Boerum Place lobby. We welcome everyones’ thoughts and encourage you to take a moment to answer these few questions below. You can answer online or drop your paper copy in the boxes provided in the lobby of each building. They will be collected one week after the survey is distributed.
Name: ______________________________
Unit: ____________ Best way to Contact_________________________
Questions on 5 point scale: 5 = Extremely important 1= Not important
- How important is renovating the 120 Boerum Place lobby?
1 2 3 4 5
- How important is the design of the building lobby on your property value?
1 2 3 4 5
- What do you like most about the lobby in its current state?
_______________________________________________________
- What do you like least about the lobby?
_______________________________________________________
- Are there features you would like to see added to the lobby (ex. plants, seating, recycling for mail)?
_________________________________________________________
- Are there other design/renovation projects of common elements you’d like to request the board look into? If so would you be willing to help with the planning?
- Do you have any other thoughts or concerns?
__________________________________________________________
Thank you for your time and attention to this matter. We will share the survey results on each bulletin board. – The Design Committee
We need your input
Dear Skytrack owners, As you may have heard several owners and the board have started the planning process for redesigning the 120 Boerum Place lobby. We welcome everyone’s thoughts and encourage you to take a moment to answer these few questions below. You can answer online at:
https://www.surveymonkey.com/r/6W8CRXV
Board of Managers Meeting Minutes: October 25, 2016
Board Members Present: Peter Levy, Pres.; Katharine Flanders Mukherji, Vice Pres.; Andrew Kurland, Sec.; Hannah Berkin-Harper; Michael Tedesco; Terra Chalberg. Also in Attendance: Elia Malaria, Managing Agent; José Perez, Superintendent.
Superintendent’s Report:
- The buildings are in good repair in general, though efforts are being made towards improving cosmetics and general cleanliness.
- 120 Boerum Lobby floor has been professionally cleaned.
- General maintenance on buildings include: door by garage painted, lock on Dean St. stairs roof repaired, hedges trimmed, nuisance ivy removed, stained hallway ceiling tiles replaced.
- New “key keeper” installed at 15 Bergen St. for post office.
- Damaged roof decking is being investigated, and will be repaired or replaced as required.
- As temperatures have dropped, the boiler is on and now providing heat to the buildings.
Financials:
- Everything is in good order.
- Late fees have been collected from units who paid Common Charges late. Reminder to pay on time to avoid fees. Late fees will rise from $25 to $50 as of January 1, 2017.
New Business:
- 134 Boerum Pl. Common Area carpeting will be shampooed.
- Hannah Berkin-Harper continues to lead the “design committee,” comprised of other Board members and residents, to discuss ideas for the Boerum Pl. lobby renovations. A survey regarding owners’ wishes has been distributed electronically, and a copy is attached here.
- Additional bids are being obtained for renovations and repairs to Dean St. entryway and staircase.
- Accumulated junk in basements (e.g., old paint) will be removed and hauled away.
- Boiler will be checked and serviced for the winter heating season.
Important Reminders:
- Common Area hallway doors cannot remain propped open. Doing so is a fire hazard and subjects us to fines.
- No personal items may be stored in any Common Areas of any the buildings, which includes basement areas. Personal items left in such areas are will be disposed, and owners will be fined.
EMERGENCY CONTACTS: Elia Malara (718) 625-4671 / José Perez (646) 239-8762
Survey
Dear Skytrack owners,
As you may have heard several owners and the board have started the planning process for redesigning the 120 Boerum Place lobby. We welcome everyones’ thoughts and encourage you to take a moment to answer these few questions below. You can answer online or drop your paper copy in the boxes provided in the lobby of each building. They will be collected one week after the survey is distributed.
Name: ______________________________
Unit: ____________ Best way to Contact_________________________
Questions on 5 point scale: 5 = Extremely important 1= Not important
- How important is renovating the 120 Boerum Place lobby?
1 2 3 4 5
- How important is the design of the building lobby on your property value?
1 2 3 4 5
- What do you like most about the lobby in its current state?
_______________________________________________________
- What do you like least about the lobby?
_______________________________________________________
- Are there features you would like to see added to the lobby (ex. plants, seating, recycling for mail)?
_________________________________________________________
- Are there other design/renovation projects of common elements you’d like to request the board look into? If so would you be willing to help with the planning?
- Do you have any other thoughts or concerns?
__________________________________________________________
Thank you for your time and attention to this matter. We will share the survey results on each bulletin board. – The Design Committee