In order to make repairs to Unit 1F, the water will be shut off from 10:00 AM until 1:00 PM on Friday, October 17.
Sorry for the inconvenience.
In order to make repairs to Unit 1F, the water will be shut off from 10:00 AM until 1:00 PM on Friday, October 17.
Sorry for the inconvenience.
The super, Jose Perez, will be on vacation from Friday evening October 13, 2017 until Sunday October 29, 2017.
He will be returning to work on Monday October 30, 2017.
During this time, Patrick Knights will be covering for Jose and performing the super’s duties. If you need to contact Patrick his cell number is 347-339-4478.
Anthony Mathews will be covering for Patrick Knights on Saturday and Sunday during this time and his cell number is 347-449-1114.
You can also contact E. M. Holding Corp. at 718-625-4671.
The plumber has to RESCHEDULE the installation of the shut off valves for the buildings water mains.
New shut off valves will be installed on the main water lines at 15 Bergen & 134 Boerum on
Wednesday October 11, 2017 and Thursday October 12, 2017.
ALL of the buildings (120, 122, 134 Boerum & 15 Bergen) will NOT have ANY HOT or COLD water from 10am – 5pm each day.
It is very important that you leave all faucets in the off position so that when the water is turned back on there will not be a flood in your unit.
We are sorry for any inconvenience this may cause.
The super, Jose Perez, will be on vacation from Friday evening October 13, 2017 until Sunday October 29, 2017.
He will be returning to work on Monday October 30, 2017.
During this time, Patrick Knights will be covering for Jose and performing the super’s duties. If you need to contact Patrick his cell number is 347-339-4478.
Karlem Roberts will be covering for Patrick Knights on Tuesday, Thursday, Saturday and Sunday during this time and his cell number is 718-501-1348.
You can also contact E. M. Holding Corp. at 718-625-4671.
Please note the Annual Tube cleaning on the Boiler will be performed on Tuesday September 26, 2017.
There will be NO Hot water from
9:00 AM until 4:00 PM.
We are sorry for any inconvenience this causes.
What Goes In the Brown Recycling Bin
Recycle the following materials in the brown recycling bin only on Sunday, after 4 PM.
Food
Food-Soiled Paper
Leaf + Yard Waste
Leaf and yard waste that won’t fit in your organics bin may be placed at the curb in open, unlined containers or in paper lawn & leaf bags. Do NOT set out yard waste in plastic bags.
Items NOT Accepted in Your Organics Bin
Brooklyn and Queens: No tree branches or firewood more than a half-inch in diameter, due to Asian Longhorned Beetle quarantine. Call 311 or schedule an appointment with the NYC Parks Department to dispose of wood debris.
All Residents of 120 Boerum Place
We want to inform you starting on Tuesday August 1, 2017 the new cement floor in the Dean Street lobby will be polished.
Everyone will have to use the main entrance at 120 Boerum Place to enter and leave the building.
Sorry for the inconvenience.
The concrete inside the entrance will be polished on Wednesday, Aug. 2. The floor cannot be walked on until 4 PM Friday, Aug. 4.
The Condo is in the process of painting all the iron work on the track, patios and decks. Anything attached to the blue iron work around your deck or patio, such as fences, flower pots, etc., must be removed by you before your scheduled painting date so that the workers can paint the blue iron work without any obstructions. As the owner, it is your responsibility to remove any of these items. This work will start on July 17, 2017 weather permitting.
The attached schedule is an approximate schedule of the dates work will be done on each apartment. Please keep in mind this schedule is subject to change due to weather conditions and the progress of work completion.
If you are a renter, this notice has been sent to the owner of your apartment notifying them of this work. You should call your landlord to find out how they will be taking care of removal of items on your deck or patio.
If you have any questions about what needs to be removed or the scheduling of the painting contact Jose Perez the super at (646) 239-8762 he will be working with the contractor Rahmann Contracting.
SKYTRACK PAINTING SCHEDULE:
Apts: 3-I, 3A, 3B July 17, 18, 19
Apts: 3C, 3D, 3E July 19, 20, 21
Apts: 3F, 3G, 5(134 B.) July 24, 25, 26
Apts: 3S, 3R, 6(134 B.) July 26, 27, 28
Apts: 3H, 3J, 3K, 3L, 3M, 3N July 31 to Aug 4
Apts: 2K, 2R Aug 7, 8, 9
Apts: 2L, 2J, 2-I, 2M, 2N Aug 10 to Aug 18
Apts: 1-I, 1J, 1K, 1L, Super Aug 21, 22, 23, 24
Apts: 1M, IN, 1-O, 1P, 1Q Aug 25 to Aug. 31
Apts: 4(134 B.), 134 Common Deck Sept 1 to Sept 6
The Roof Track, Common Decks and Bridge will be
done at different times during this working period.