Updates on E-waste

From the

Updates on E-waste
Unfortunately, our E-waste program did not get any city funding restored.  We are still exploring options how to resume this important city wide program. In the meantime, you can read our blog post about alternative resources for recycling E-waste.
 https://www.lesecologycenter.org/how-to-cut-e-waste-and-remain-sustainable/?utm_source=Lower+East+Side+Ecology+E-Newsletter&utm_campaign=4e4a5d6271-EMAIL_CAMPAIGN_2019_10_24_05_10_COPY_01&utm_medium=email&utm_term=0_eb9350fdda-4e4a5d6271-198236254

The Lower East Side Ecology Center ran the E-Waste recycling center in Gowanus.

Covid-19 House Rules

With the New York State phase three reopening in place, Skytrack is providing a set of rules connected to COVID related safety measures:

  • Residents, visitors and workers must wear a face mask and practice “social distancing” in all of the interior public spaces and on the roof tracks.
  • Congregating in common areas is strongly discouraged.
  • Gatherings of more than ten people on common roof decks is not permitted.  Masks must be worn where a six foot distance from non-household members may not be consistently achieved.
  • Please limit visitors to the building as much as possible.
  • Movers and construction crews are expected to wear masks in all common areas.
  • Whenever possible, please wash or sanitize hands before and after touching handrails and building and hall door knobs, or use gloves.
  • Sales: “Open Houses” are not permitted
    • Showing of any unit must be scheduled with the Super at least 24 hours in advance
    • Any showing may not include more than four people, including the showing agent
  • These rules will be re-evaluated every 30 days

Annual Meeting Tomorrow

Reminder that the Skytrack Annual Meeting will take place tomorrow. The meeting will commence at 8 PM, and the video/teleconference line will open at 7:45 PM.

Registration is required. If you have not already registered, please Click here to do so. 

After you register, you will receive an email containing instructions to join the meeting by video or telephone.

If you are unable to attend the meeting, please complete the Annual Meeting Proxy Form by clicking here.

Register for Annual Meeting

The Annual Meeting of the Skytrack Condominium will take place on Tuesday, June 16 at 8 PM via Zoom Video or Teleconference.
Advanced Registration is REQUIRED
. If you have not already done so,   Please register by clicking this link.

Note that three Board Member terms expire this year, and their seats are up for election.  All owners are invited to run for available seats.  Please inform EM Holding Corp. if you would like to run.  We will vote at the meeting.

If there is a chance you may not be able to attend the meeting, please designate a proxy so that we have the required representation at the meeting.  Please complete a proxy form by visiting this link.

The video/teleconference will open at 7:45 PM so we can start the meeting promptly at 8:00 PM.

2020 Annual Meeting

The Annual Meeting of the Skytrack Condominium will take place on Tuesday, June 16 at 8 PM via Zoom Video or Teleconference.
Advanced Registration is REQUIREDPlease register by clicking this link.

Note that three Board Member terms expire this year, and their seats are up for election.  All owners are invited to run for available seats.  Please inform EM Holding Corp. if you would like to run.  We will vote at the meeting.

If there is a chance you may not be able to attend the meeting, please designate a proxy so that we have the required representation at the meeting.  Please complete a proxy form by visiting this link.

The video/teleconference will open at 7:45 PM so we can start the meeting promptly at 8:00 PM.

120 Boerum Roof Project to Commence

Please be advised the roof repair/resurfacing project at 120 Boerum is scheduled to commence this week (week of May 11). The initial phase will include the areas above “A” and “B” apartments, as well as the entirety of the “penthouse” roof structures. Note that portions of the track and common area decks will be unavailable for use during the project so that equipment and materials can be staged. This phase is expected to take approximately one week, but the work is weather dependent, so may take a bit longer.