Expect No Hot Water Thursday Sept 20th

In connection with necessary inspection, maintenance, and repairs to the heating and hot water systems, please note that we expect there to be no hot water during the day on Thursday, September 20th.  We will provide more specifics as to timing here and on posted signs as soon as we have additional details.  Thank you for your understanding.

Heating System Will Be Refilled Soon

Please be advised that the heating system needs to be refilled to prepare for the heating season, and once it is, it will no longer be possible to perform any modifications to radiators/heating pipes within your Units.  Any remaining Owners who desire to complete such work in their Units must do so this week.  Thank you for your understanding and cooperation.

Update – 120 Boerum Pl. Mailbox change

Though we were informed that the Post Office would begin using the new mailboxes in the main lobby on Thursday August 23, it appears that was only the date USPS could begin to use the new mailboxes.  As you are aware, so far mail has continued to be delivered to the temporary location at the Dean Street entrance.  However, please be aware that USPS may make the switch any day.

Reminder – Heating System is Drained Temporarily

This is a reminder that the heating system has been drained for the past 3 weeks to allow all owners to have necessary repairs/modifications performed on the components of the heating system in their units.  A date for re-filling of the system has not yet been set, but will need to be scheduled soon.  Accordingly, if you would like to have any work performed, please schedule this with the Super/Management as soon as possible.  You must coordinate all such work with the Super/Management, as there will still be some water in the system in various locations, and precautions must be taken to ensure there are no leaks.

Once the heating system is re-filled, it will not be drained again (as doing so is both costly and wasteful).  Thank you for your understanding.

120 Boerum Lobby Update

The remodeled lobby is now accessible to 1st floor residents.  This includes the trash chute, so please start using that once again.

The “main” stairs are still not open, and likely will not be until next week.  Additionally, mail will continue to be delivered to the old boxes at the Dean St. entrance until the lobby is fully opened.  Thank you again for your patience and understanding.

 

 

120 Boerum Pl. Lobby Update

We thank everyone for their patience. The lobby is nearly finished. There are 3 stairs left to tile and the brass railings need to go in. There was a delay in all of the brass arriving which is holding up the opening of the lobby. We anticipate completion next week. Val will be distributing mailbox keys in the coming days so we have an easy transition.